Construction:
1. We make the foundation, starting with site grading, marking, earth excavation, formwork construction, reinforcement and concrete pouring, refinement.
2. We bring the selected timber to the operation facilities, where the logs are prepared in a manual way (hams and planing) to preserve the protective layer of the timber. After that the timber is chopped off (it is made much more round using a block plane and adjust logs to the selected diameter). Then the prepared timber is provided to the log construction, where professional chippermen set the logs by a level, outline the logs to avoid cracks and gaps, after which the logs are adjusted by sawing and installed into the finished log house in its place. After the project construction of the log house is completed, it is impregnated with a colourless safe special impregnant to preserve the wood, after which the logs are marked for further disassembly and transportation to the assembly site.
3. Installation at the customer's site on a ready-made foundation with a joint of floor, interfloor and ceiling beams.
4. Roof manufacturing includes raftering, lathing and covering at the request of the customer with metal tiles, soft roofing, etc.